Prepare a list of material and estimate the cost for providing service connection to a building at 240 V single phase 50 Hz having a light and fan load of 2 KW and heating load of 2 KW. The supply is to be given from an overhead line 10mm

All QuestionsCategory: Electrical Estimating And CostingPrepare a list of material and estimate the cost for providing service connection to a building at 240 V single phase 50 Hz having a light and fan load of 2 KW and heating load of 2 KW. The supply is to be given from an overhead line 10mm
Chetan Shidling Staff asked 2 years ago

Can anyone help me?